On the territory of the SEZ, including VAT - 2.448 tenge/kWh
The number of paths - 2.
The length of the receiving and departure tracks is 3.5 km.
Road category – II
Estimated speed - 60 km/h;
Number of traffic lanes - 2
Traffic lane width - 4.0 m
The internal length is 4 km.
Heating 1 hego calorie - 35 788.49 tenge
Two single-circuit overhead power lines VL-220 kV voltage - 220 kV.
On the territory of the SEZ, including VAT -25.33 tenge
Classiness - 2nd class. The total area of the station is 26175 sq/m.
The number of paths - 2.
The useful length of the receiving and departure tracks is 846 m.
Road category – IV
Estimated speed - 60 km/h;
Number of traffic lanes – 2,4,6;
Lane width - 3.0 m
Water pipeline on the territory of the FEZ, including VAT – 134.81 tenge
The maximum water consumption is 24.3 m³/hour
Heating 1 hego calorie - 6716.38 tenge
Water disposal on the territory of the SEZ, including VAT - 94.64 tenge
Протяженность: 5,6км
Мощность: 15+25 мВт
Протяженность: 10,6км
Мощность: 15+25 70м³/час
Протяженность: 6,5км
Мощность: 300м³/час
Протяженность: 6,1км
Мощность: 3800м³/час
Протяженность: 1,4 км
Примечание: Требуется ремонт путей протяженностью от 100- 200м.(замена шпал,установка соединений рельсов, ремонт стрелочных переводов)
Единица измерения: м³/ч
Стоимость, тг: 95,29 (с учетом НДС)
Единица измерения: кВт
Стоимость, тг: 25 (с учетом НДС)
Единица измерения: м³/ч
Стоимость, тг: 40,75 (с учетом НДС)
Единица измерения: м³/ч
Стоимость, тг: 40,75 (с учетом НДС)
Единица измерения: м³/ч
Стоимость, тг: 168 (с учетом НДС)