Industrial zone 2

Brownfield Industrial Estate - 35 he

Currently, 8 railway tracks with a total length of 3.1 km in Brownfield have the following infrastructure, including railroad dead ends and fences.

«TURKISTAN TEMIRBETON» LLP

«TURKISTAN TEMIRBETON» LLP Manufacturing LLP, with an investment volume of 1.2 billion tenge, will be carried out on the territory of the IU from Turkistan, located in the 35-hectare industrial zone in Kentau.

The products manufactured are reinforced concrete products in the assortment (floor slabs, bolts, pillars, ventilation blocks, wall panels, borders and small parts with a capacity of 80,000 m2 per year). To date, the commissioning and repair of facilities continues.